Delays with bridge footpath in Manorhamilton need to be resolved

The Main Street area of Ballykelly is set to undergo resurfacing work.placeholder image
The Main Street area of Ballykelly is set to undergo resurfacing work.

North Leitrim councillors have stressed the need for the bridge walkway on Castle Street, Manorhamilton to be completed as soon as possible.

Legal issues have led to delays in putting what Manorhamilton MD Cathaoirleach, Cllr Frank Dolan, describes as “a necessary piece of infrastructure for the town”.

Cllr Dolan and Cllr Felim Gurn both highlighted the need for progress on this project.

Cllr Gurn warned that “danger is mounting for pedestrians with traffic coming from all directions” at this location.

He said there is a very real possibility that someone could be seriously injured or killed at this location if no resolution is found to the current delays holding up the completion of these works.

Cllr Frank Dolan agreed, noting that “the provision of a footpath on the bridge at Castle Street in Manorhamilton still remains to be a necessary piece of infrastructure for the town. The funding that was allocated for this project in the past was diverted to another project in the town at the time. I ask that this be revisited again.”

A written response from the local authority noted that the Council is “pursuing resolution of wayleave issues at this location to progress footpath proposals through statutory procedures.

“Once access to the lands is resolved an application for funding can be lodged with the National Transport Authority under Active Travel proposals.”

Related topics:
Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice