Delays for water users at Rooskey Bridge as floating jetties are installed downstream

Rooskey bridge over The River Shannonplaceholder image
Rooskey bridge over The River Shannon

All water users are advised of possible delays to bridge lifts and lock operations over the next six weeks in the Rooskey area.

Delays are expected as a result of instream works to install floating jetties immediately downstream of Roosky Bridge between Monday, August 24 and Wednesday, September 30, 2020.

Waterways Ireland have apologised for any inconvenience caused and thank users for their cooperation.

Related topics:
Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice